Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Under maintenanceVerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Brackley SF Connect · BP Pulse

Northampton Road, NN13 5SZ · Open 24h
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CHAdeMO · 100 kW0% reliability0 of 2 available
BPU00580% reliabilityOut of order
BPU00590% reliabilityOut of order
CCS · 150 kW0% reliability0 of 2 available
BPU00580% reliabilityOut of order
BPU00590% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
PaymentCredit cardApp start/stopReservableRFID card
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Brackley SF Connect · BP Pulse?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does Brackley SF Connect · BP Pulse have?

4 charging sockets: 2 × 150 kW CCS, 2 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Brackley SF Connect · BP Pulse open 24/7?

Yes - Brackley SF Connect · BP Pulse is open 24 hours a day, 7 days a week.

How reliable is Brackley SF Connect · BP Pulse?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Brackley SF Connect · BP Pulse?

Brackley SF Connect · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at Brackley SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Brackley SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Brackley SF Connect · BP Pulse?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 13 Oct 2026