Chalfonts Way SF Connect · BP Pulse
CCS · 150 kW91% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at Chalfonts Way SF Connect · BP Pulse?
Up to 150 kW DC via CCS.
How many charging sockets does Chalfonts Way SF Connect · BP Pulse have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Chalfonts Way SF Connect · BP Pulse open 24/7?
Yes - Chalfonts Way SF Connect · BP Pulse is open 24 hours a day, 7 days a week.
When is Chalfonts Way SF Connect · BP Pulse busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 8 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Chalfonts Way SF Connect · BP Pulse?
Amp Map measured 93.3% uptime here from recorded live status over the last 30 days, across 9 observed charging sessions.
Who operates Chalfonts Way SF Connect · BP Pulse?
Chalfonts Way SF Connect · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Chalfonts Way SF Connect · BP Pulse?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chalfonts Way SF Connect · BP Pulse?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chalfonts Way SF Connect · BP Pulse?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.