Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Under maintenanceVerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Bat & Ball Community Centre · BP Pulse

Bat & Ball Community Centre, Crampton's Road, TN14 5DN
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 7 kW0% reliability0 of 2 available
134390% reliabilityOut of order
134390% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.65/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
NoteNo charging outside opening hours
PaymentApp start/stopRFID card
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Bat & Ball Community Centre · BP Pulse?

The operator's published price is £0.65/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Bat & Ball Community Centre · BP Pulse?

Up to 7 kW AC via Type 2.

How many charging sockets does Bat & Ball Community Centre · BP Pulse have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

How reliable is Bat & Ball Community Centre · BP Pulse?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Bat & Ball Community Centre · BP Pulse?

Bat & Ball Community Centre · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at Bat & Ball Community Centre · BP Pulse?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bat & Ball Community Centre · BP Pulse?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Bat & Ball Community Centre · BP Pulse?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 13 Oct 2026