Upton Country Park Welcome Centre · Be.EV
Type 2 · 22 kW100% reliability2 of 2 available
CCS · 50 kW100% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | £0.77/kWh |
| Type 2 | 22 kW | £0.59/kWh |
How much does it cost to charge at Upton Country Park Welcome Centre · Be.EV?
The operator's published price is CCS £0.77/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Upton Country Park Welcome Centre · Be.EV?
Up to 50 kW DC via CCS, Type 2.
How many charging sockets does Upton Country Park Welcome Centre · Be.EV have?
4 charging sockets: 2 × 50 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Upton Country Park Welcome Centre · Be.EV open 24/7?
Yes - Upton Country Park Welcome Centre · Be.EV is open 24 hours a day, 7 days a week.
When is Upton Country Park Welcome Centre · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Upton Country Park Welcome Centre · Be.EV?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 132 observed charging sessions.
Who operates Upton Country Park Welcome Centre · Be.EV?
Upton Country Park Welcome Centre · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Upton Country Park Welcome Centre · Be.EV?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Upton Country Park Welcome Centre · Be.EV?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Upton Country Park Welcome Centre · Be.EV?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.