Tyne Valley Retail Park · Be.EV
CCS · 150 kW100% reliability1 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 150 kW | £0.87/kWh |
| CCS | 50 kW | £0.77/kWh |
| CHAdeMO | 50 kW | £0.77/kWh |
| Type 2 | 22 kW | £0.59/kWh |
How much does it cost to charge at Tyne Valley Retail Park · Be.EV?
The operator's published price is CCS £0.87/kWh · Type 2 £0.59/kWh · CCS £0.77/kWh · CHAdeMO £0.77/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Tyne Valley Retail Park · Be.EV?
Up to 150 kW DC via CCS, Type 2, CHAdeMO.
How many charging sockets does Tyne Valley Retail Park · Be.EV have?
5 charging sockets: 2 × 150 kW CCS, 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Tyne Valley Retail Park · Be.EV open 24/7?
Yes - Tyne Valley Retail Park · Be.EV is open 24 hours a day, 7 days a week.
When is Tyne Valley Retail Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Tyne Valley Retail Park · Be.EV?
Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 450 observed charging sessions.
Who operates Tyne Valley Retail Park · Be.EV?
Tyne Valley Retail Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Tyne Valley Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£48 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tyne Valley Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tyne Valley Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.