Theatre Street Car Park · Be.EV
CCS · 60 kW90% reliability2 of 2 available
Type 2 · 22 kW100% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 60 kW | £0.77/kWh |
| Type 2 | 22 kW | £0.59/kWh |
How much does it cost to charge at Theatre Street Car Park · Be.EV?
The operator's published price is CCS £0.77/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Theatre Street Car Park · Be.EV?
Up to 60 kW DC via CCS, Type 2.
How many charging sockets does Theatre Street Car Park · Be.EV have?
4 charging sockets: 2 × 60 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Theatre Street Car Park · Be.EV open 24/7?
Yes - Theatre Street Car Park · Be.EV is open 24 hours a day, 7 days a week.
When is Theatre Street Car Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is Theatre Street Car Park · Be.EV?
Amp Map measured 94.8% uptime here from recorded live status over the last 30 days, across 80 observed charging sessions.
Who operates Theatre Street Car Park · Be.EV?
Theatre Street Car Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Theatre Street Car Park · Be.EV?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Theatre Street Car Park · Be.EV?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Theatre Street Car Park · Be.EV?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.