Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 4 of 4VerifiedBe.EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Theatre Street Car Park · Be.EV

Theatre Street, PE37 7HF
Rate this charger
Network: Be.EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 60 kW90% reliability2 of 2 available
PA0033-190% reliabilityAvailable
PA0033-290% reliabilityAvailable
Type 2 · 22 kW100% reliability2 of 2 available
AD01033-1100% reliabilityAvailable
AD01033-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS60 kW£0.77/kWh
Type 222 kW£0.59/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
NoteNo charging outside opening hours
ParkingCar park
PaymentApp start/stop
Facilities
Car park
6am9am12pm3pm6pm9pm
From live status history · busiest around 5pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Theatre Street Car Park · Be.EV?

The operator's published price is CCS £0.77/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Theatre Street Car Park · Be.EV?

Up to 60 kW DC via CCS, Type 2.

How many charging sockets does Theatre Street Car Park · Be.EV have?

4 charging sockets: 2 × 60 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Theatre Street Car Park · Be.EV open 24/7?

Yes - Theatre Street Car Park · Be.EV is open 24 hours a day, 7 days a week.

When is Theatre Street Car Park · Be.EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Theatre Street Car Park · Be.EV?

Amp Map measured 94.8% uptime here from recorded live status over the last 30 days, across 80 observed charging sessions.

Who operates Theatre Street Car Park · Be.EV?

Theatre Street Car Park · Be.EV is on the Be.EV network.

How long does a Tesla Model Y Long Range take to charge at Theatre Street Car Park · Be.EV?

A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Theatre Street Car Park · Be.EV?

A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Theatre Street Car Park · Be.EV?

A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 60 kW CCS~58 min · ≈ 55 kWh · ~£43
Tesla Model 3 Rear-Wheel Drive 10–80% · 60 kW CCS~43 min · ≈ 40 kWh · ~£31
Audi Q4 e-tron 50 10–80% · 60 kW CCS~57 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 60 kW CCS~53 min · ≈ 51 kWh · ~£39
MG Motor MG4 Trophy 10–80% · 60 kW CCS~47 min · ≈ 43 kWh · ~£33
Hyundai Kona Electric Long Range 10–80% · 60 kW CCS~49 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 13 Oct 2026