Spennymoor Leisure Centre Car Park · Be.EV
CCS · 60 kW44% reliability1 of 2 available
CHAdeMO · 50 kW32% reliability1 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Spennymoor Leisure Centre Car Park · Be.EV?
The operator's published price is £0.77/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Spennymoor Leisure Centre Car Park · Be.EV?
Up to 60 kW DC via CHAdeMO, CCS.
How many charging sockets does Spennymoor Leisure Centre Car Park · Be.EV have?
4 charging sockets: 2 × 50 kW CHAdeMO, 2 × 60 kW CCS. Live per-socket availability is shown on this page.
Is Spennymoor Leisure Centre Car Park · Be.EV open 24/7?
Yes - Spennymoor Leisure Centre Car Park · Be.EV is open 24 hours a day, 7 days a week.
When is Spennymoor Leisure Centre Car Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Spennymoor Leisure Centre Car Park · Be.EV?
Amp Map measured 38.8% uptime here from recorded live status over the last 30 days, across 101 observed charging sessions.
Who operates Spennymoor Leisure Centre Car Park · Be.EV?
Spennymoor Leisure Centre Car Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Spennymoor Leisure Centre Car Park · Be.EV?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Spennymoor Leisure Centre Car Park · Be.EV?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Spennymoor Leisure Centre Car Park · Be.EV?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.