Sheffield Parkway Central Retail Park · Be.EV
CCS · 150 kW99% reliability6 of 9 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Sheffield Parkway Central Retail Park · Be.EV?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Sheffield Parkway Central Retail Park · Be.EV?
Up to 150 kW DC via CCS, CHAdeMO.
How many charging sockets does Sheffield Parkway Central Retail Park · Be.EV have?
10 charging sockets: 9 × 150 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Sheffield Parkway Central Retail Park · Be.EV open 24/7?
Yes - Sheffield Parkway Central Retail Park · Be.EV is open 24 hours a day, 7 days a week.
When is Sheffield Parkway Central Retail Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Sheffield Parkway Central Retail Park · Be.EV?
Amp Map measured 97.4% uptime here from recorded live status over the last 30 days, across 1465 observed charging sessions.
Who operates Sheffield Parkway Central Retail Park · Be.EV?
Sheffield Parkway Central Retail Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Sheffield Parkway Central Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sheffield Parkway Central Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sheffield Parkway Central Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.