Riverside Retail Park · Be.EV
CCS · 300 kW100% reliability5 of 10 available
CHAdeMO · 50 kW100% reliability5 of 5 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 300 kW | £0.87/kWh |
| CHAdeMO | 50 kW | £0.77/kWh |
How much does it cost to charge at Riverside Retail Park · Be.EV?
The operator's published price is CHAdeMO £0.77/kWh · CCS £0.87/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Riverside Retail Park · Be.EV?
Up to 300 kW DC via CHAdeMO, CCS.
How many charging sockets does Riverside Retail Park · Be.EV have?
15 charging sockets: 5 × 50 kW CHAdeMO, 10 × 300 kW CCS. Live per-socket availability is shown on this page.
Is Riverside Retail Park · Be.EV open 24/7?
Yes - Riverside Retail Park · Be.EV is open 24 hours a day, 7 days a week.
When is Riverside Retail Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Riverside Retail Park · Be.EV?
Amp Map measured 99.9% uptime here from recorded live status over the last 30 days, across 729 observed charging sessions.
Who operates Riverside Retail Park · Be.EV?
Riverside Retail Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Riverside Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£48 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Riverside Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Riverside Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.