Oldham Civic Centre · Be.EV
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | £0.77/kWh |
| CHAdeMO | 50 kW | £0.77/kWh |
| Type 2 | 11 kW | £0.59/kWh |
How much does it cost to charge at Oldham Civic Centre · Be.EV?
The operator's published price is CCS £0.77/kWh · CHAdeMO £0.77/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Oldham Civic Centre · Be.EV?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Oldham Civic Centre · Be.EV have?
3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 11 kW Type 2. Live per-socket availability is shown on this page.
Is Oldham Civic Centre · Be.EV open 24/7?
Yes - Oldham Civic Centre · Be.EV is open 24 hours a day, 7 days a week.
When is Oldham Civic Centre · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 9 pm. The live status on this page shows what is free before you set off.
How reliable is Oldham Civic Centre · Be.EV?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 26 observed charging sessions.
Who operates Oldham Civic Centre · Be.EV?
Oldham Civic Centre · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Oldham Civic Centre · Be.EV?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oldham Civic Centre · Be.EV?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Oldham Civic Centre · Be.EV?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.