Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 3 of 3VerifiedBe.EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Mill Gate Shopping Centre · Be.EV

Miden Parade, BL9 0QQ
Rate this charger
Network: Be.EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
BVRGM0004-1CCS · 51 kW100% reliabilityAvailable
BVRGM0004-2CHAdeMO · 51 kW97% reliabilityAvailable
BVRGM0004-3Type 2 · 22 kW100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS51 kW£0.77/kWh
CHAdeMO51 kW£0.77/kWh
Type 222 kW£0.59/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursMon–Sat 08:00–18:30Sun 10:00–18:00
NoteNo charging outside opening hours
ParkingCar park
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 1pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Mill Gate Shopping Centre · Be.EV?

The operator's published price is CCS £0.77/kWh · CHAdeMO £0.77/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Mill Gate Shopping Centre · Be.EV?

Up to 51 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Mill Gate Shopping Centre · Be.EV have?

3 charging sockets: 1 × 51 kW CCS, 1 × 51 kW CHAdeMO, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Mill Gate Shopping Centre · Be.EV open?

Opening hours: Mon–Sat 08:00–18:30; Sun 10:00–18:00.

When is Mill Gate Shopping Centre · Be.EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Mill Gate Shopping Centre · Be.EV?

Amp Map measured 98.9% uptime here from recorded live status over the last 30 days, across 30 observed charging sessions.

Who operates Mill Gate Shopping Centre · Be.EV?

Mill Gate Shopping Centre · Be.EV is on the Be.EV network.

How long does a Tesla Model Y Long Range take to charge at Mill Gate Shopping Centre · Be.EV?

A typical 10–80% rapid charge takes about 68 min on the 51 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mill Gate Shopping Centre · Be.EV?

A typical 10–80% rapid charge takes about 50 min on the 51 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Mill Gate Shopping Centre · Be.EV?

A typical 10–80% rapid charge takes about 65 min on the 51 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 51 kW CCS~68 min · ≈ 55 kWh · ~£43
Tesla Model 3 Rear-Wheel Drive 10–80% · 51 kW CCS~50 min · ≈ 40 kWh · ~£31
Audi Q4 e-tron 50 10–80% · 51 kW CCS~65 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 51 kW CCS~63 min · ≈ 51 kWh · ~£39
MG Motor MG4 Trophy 10–80% · 51 kW CCS~54 min · ≈ 43 kWh · ~£33
Hyundai Kona Electric Long Range 10–80% · 51 kW CCS~54 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 51 kW CHAdeMO~54 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 13 Oct 2026