Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 3 of 3VerifiedBe.EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Harrogate Street · Be.EV

Harrogate Street, WN1 1XQ · Open 24h
Rate this charger
Network: Be.EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
BVRGM0015-1CCS · 50 kW100% reliabilityAvailable
BVRGM0015-2CHAdeMO · 50 kW90% reliabilityAvailable
BVRGM0015-3Type 2 · 11 kW100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS50 kW£0.77/kWh
CHAdeMO50 kW£0.77/kWh
Type 211 kW£0.59/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
NoteNo charging outside opening hours
ParkingCar park
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 10am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Harrogate Street · Be.EV?

The operator's published price is CCS £0.77/kWh · CHAdeMO £0.77/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Harrogate Street · Be.EV?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Harrogate Street · Be.EV have?

3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 11 kW Type 2. Live per-socket availability is shown on this page.

Is Harrogate Street · Be.EV open 24/7?

Yes - Harrogate Street · Be.EV is open 24 hours a day, 7 days a week.

When is Harrogate Street · Be.EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Harrogate Street · Be.EV?

Amp Map measured 96.8% uptime here from recorded live status over the last 30 days, across 96 observed charging sessions.

Who operates Harrogate Street · Be.EV?

Harrogate Street · Be.EV is on the Be.EV network.

How long does a Tesla Model Y Long Range take to charge at Harrogate Street · Be.EV?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Harrogate Street · Be.EV?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Harrogate Street · Be.EV?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£43
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£31
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£39
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£33
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 13 Oct 2026