Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 7 of 7VerifiedBe.EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Bell Street Car Park · Be.EV

Bell Street Car Park, SP7 8AP
Rate this charger
Network: Be.EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 150 kW99% reliability2 of 2 available
DR0006-199% reliabilityAvailable
DR0006-398% reliabilityAvailable
DR0006-2CHAdeMO · 50 kW95% reliabilityAvailable
Type 2 · 22 kW100% reliability2 of 2 available
AD00112-1100% reliabilityAvailable
AD00112-2100% reliabilityAvailable
CCS · 50 kW100% reliability2 of 2 available
ALW0012-1100% reliabilityAvailable
ALW0012-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS150 kW£0.87/kWh
CHAdeMO50 kW£0.77/kWh
CCS50 kW£0.77/kWh
Type 222 kW£0.59/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
NoteNo charging outside opening hours
ParkingCar park
PaymentApp start/stop
Facilities
Car park
6am9am12pm3pm6pm9pm
From live status history · busiest around 11am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Bell Street Car Park · Be.EV?

The operator's published price is CHAdeMO £0.77/kWh · CCS £0.77/kWh · CCS £0.87/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Bell Street Car Park · Be.EV?

Up to 150 kW DC via CHAdeMO, CCS, Type 2.

How many charging sockets does Bell Street Car Park · Be.EV have?

7 charging sockets: 1 × 50 kW CHAdeMO, 2 × 50 kW CCS, 2 × 150 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Bell Street Car Park · Be.EV open 24/7?

Yes - Bell Street Car Park · Be.EV is open 24 hours a day, 7 days a week.

When is Bell Street Car Park · Be.EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Bell Street Car Park · Be.EV?

Amp Map measured 98.9% uptime here from recorded live status over the last 30 days, across 265 observed charging sessions.

Who operates Bell Street Car Park · Be.EV?

Bell Street Car Park · Be.EV is on the Be.EV network.

How long does a Tesla Model Y Long Range take to charge at Bell Street Car Park · Be.EV?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£48 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bell Street Car Park · Be.EV?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Bell Street Car Park · Be.EV?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£48
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£35
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£44
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£44
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£37
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 13 Oct 2026