Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 1 Jun 2023

Stadium MK · Allego BV

Stadium Way, MK1 1ST
Rate this charger
Network: Allego BV
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CCS350 kW1 socket
CCS350 kW1 socket
CCS350 kW1 socket
CCS350 kW1 socket
CCS350 kW1 socket
CCS350 kW1 socket
Location info
Price£0.85/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · pay at location
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Stadium MK · Allego BV?

The operator's published price is £0.85/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Stadium MK · Allego BV?

Up to 350 kW DC via CCS.

How many charging sockets does Stadium MK · Allego BV have?

6 charging sockets: 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS.

Who operates Stadium MK · Allego BV?

Stadium MK · Allego BV is on the Allego BV network.

How long does a Tesla Model Y Long Range take to charge at Stadium MK · Allego BV?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stadium MK · Allego BV?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Stadium MK · Allego BV?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 350 kW CCS~21 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 350 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 350 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 350 kW CCS~18 min
MG Motor MG4 Trophy 10–80% · 350 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 350 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 1 Jun 2023