Stadium MK · Allego BV
How much does it cost to charge at Stadium MK · Allego BV?
The operator's published price is £0.85/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Stadium MK · Allego BV?
Up to 350 kW DC via CCS.
How many charging sockets does Stadium MK · Allego BV have?
6 charging sockets: 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS.
Who operates Stadium MK · Allego BV?
Stadium MK · Allego BV is on the Allego BV network.
How long does a Tesla Model Y Long Range take to charge at Stadium MK · Allego BV?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stadium MK · Allego BV?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stadium MK · Allego BV?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.