Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 7 Sept 2023

Shell Recharge, Maresfield Bypass · Allego BV

Maresfield Bypass, TN22 5EP
Rate this charger
Network: Allego BV
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CCS150 kW1 socket
CHAdeMO50 kW1 socket
Location info
PriceCCS 150 kW: £0.85/kWh; CHAdeMO 50 kW: £0.79/kWh (2023-03-02)
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · pay at location
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Shell Recharge, Maresfield Bypass · Allego BV?

The operator's published price is CCS 150 kW: £0.85/kWh; CHAdeMO 50 kW: £0.79/kWh (2023-03-02). Prices come from the operator's own data feed and can change.

How fast is charging at Shell Recharge, Maresfield Bypass · Allego BV?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does Shell Recharge, Maresfield Bypass · Allego BV have?

2 charging sockets: 1 × 150 kW CCS, 1 × 50 kW CHAdeMO.

Who operates Shell Recharge, Maresfield Bypass · Allego BV?

Shell Recharge, Maresfield Bypass · Allego BV is on the Allego BV network.

How long does a Tesla Model Y Long Range take to charge at Shell Recharge, Maresfield Bypass · Allego BV?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell Recharge, Maresfield Bypass · Allego BV?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Shell Recharge, Maresfield Bypass · Allego BV?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 7 Sept 2023