MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 8 Apr 2026
Savile Road Service Station · Alfapower
Savile Road, WF10 1PD
Rate this charger
Network: Alfapower
Always check directly with the charge point operator for the most up-to-date information.
Connectors
50 kW1 socket
50 kW1 socket
22 kW1 socket
Location info
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Savile Road Service Station · Alfapower?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Savile Road Service Station · Alfapower have?
2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Savile Road Service Station · Alfapower?
Savile Road Service Station · Alfapower is on the Alfapower network.
How long does a Tesla Model Y Long Range take to charge at Savile Road Service Station · Alfapower?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Savile Road Service Station · Alfapower?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Savile Road Service Station · Alfapower?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 8 Apr 2026