MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 20 Mar 2019
40 Godstone Road
Godstone Road, CR8 5JE
Rate this charger
Connectors
50 kW1 socket
50 kW1 socket
43 kW1 socket
Location info
Price29p/kWh PAYG
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
NotesESB EV Solutions
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at 40 Godstone Road?
The operator's published price is 29p/kWh PAYG. Prices come from the operator's own data feed and can change.
How fast is charging at 40 Godstone Road?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does 40 Godstone Road have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
How long does a Tesla Model Y Long Range take to charge at 40 Godstone Road?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 40 Godstone Road?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 40 Godstone Road?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 20 Mar 2019