MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 23 Aug 2017
25 Windsor Road
25 Windsor Road, SL1 2EJ
Rate this charger
Connectors
7 kW4 sockets
Location info
AccessPrivate · membership required
Getting thereBehind barrier on office car park. Workplace charging. Bays marked with disabled parking symbol. Currently seems to accept any RFID.
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at 25 Windsor Road?
Up to 7 kW AC via Type 2.
How many charging sockets does 25 Windsor Road have?
4 charging sockets: 4 × 7 kW Type 2.
Can anyone charge at 25 Windsor Road?
The operator lists this charger as private - access is restricted.
How long does a Tesla Model Y Long Range take to charge at 25 Windsor Road?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 25 Windsor Road?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 25 Windsor Road?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 23 Aug 2017