MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 May 2023
22 kW Easee
Whitecross Lane, PO37 7EJ
Rate this charger
Connectors
22 kW1 socket
22 kW1 socket
Location info
AccessPublic · pay at location
Getting thereFront car parking area of Store It Self Storage
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at 22 kW Easee?
Up to 22 kW AC via Type 2.
How many charging sockets does 22 kW Easee have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
How long does a Tesla Model Y Long Range take to charge at 22 kW Easee?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 22 kW Easee?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 22 kW Easee?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 4 May 2023